Before construction starts
Good construction starts on paper. Before the first excavation you should have approved building permission, a complete set of architectural and structural drawings, a soil investigation where the ground conditions are unknown, and a clear contract with the specification of every material. A realistic budget with a contingency of around 10 percent avoids stopping work halfway.
1. Site clearance and marking
The site is cleared and levelled, and the building is marked out from the drawings using reference lines. Marking errors at this stage shift the whole building, so check the centre-line marking against the drawings and the plot boundaries before excavation.
2. Excavation and foundation
Pits are excavated to the depth specified by the structural engineer, a layer of plain cement concrete (PCC) is laid, and footings are cast. Check the depth and soil at the bottom of every pit, and inspect footing reinforcement and cover before concreting.
3. Columns up to plinth and plinth beam
Columns rise to plinth level, followed by the plinth beam that ties them together. The area inside is backfilled in compacted layers, anti-termite treatment is done, and the floor base is laid. Poorly compacted filling is a common cause of floor cracks later.
4. Superstructure: columns, beams and slabs
Each floor involves columns, then beam and slab formwork, reinforcement, inspection and concreting. Concrete needs proper curing to gain strength: as per IS 456, exposed surfaces should be kept continuously wet for at least 7 days for ordinary Portland cement, and longer for blended cements or in hot, dry weather. Props under slabs must stay in place for the period the engineer specifies, which depends on the span.
5. Masonry
Walls are built with bricks, fly-ash bricks or AAC blocks. Check that walls are in line and plumb, joints are filled, and lintels are cast over openings. Soak clay bricks before use; AAC blocks need their own adhesive or mortar as specified.
6. Electrical and plumbing first fix
Conduits and pipes are laid in walls and slabs before plastering. This is the time to confirm every switch, socket and water point against the furniture layout. Pressure-test water lines before they are covered.
7. Plastering and waterproofing
Internal and external plastering follow, with curing. Waterproofing of the roof, bathrooms, balconies and the sump is critical and should be done with a proven system and tested by ponding water before tiles are laid.
8. Flooring, doors, windows and finishing
Flooring and tiling, door and window frames and shutters, painting, electrical and sanitary fittings complete the house. Check tile levels and joints, slopes towards drains in wet areas, and that doors and windows close properly.
9. Handover
Before handover, walk through with a snag list, test every electrical point and tap, and collect the as-built drawings, warranties and material bills. These help with future maintenance and any extension.
Renovating instead of rebuilding?
If you are renovating an older house, start with a structural check, especially before removing walls or adding load. BBMC handles construction and renovation across Hyderabad with our own design, structural and Vaasthu team, so decisions on site are made quickly and by people who know the drawings.